Thursday , November 21 2024

Three central provinces to be connected by new highway


A 57-kilometer highway will be built to link the central Khanh Hoa, Lam Dong and Ninh Thuan provinces at a cost of VND1.9 trillion (US$81 million).

It will be built between Khanh Vinh District in Khanh Hoa, home to Nha Trang, and Bac Ai District in Ninh Thuan, renowned for its Cham civilization relics and culture and beautiful sand dunes.

The nine-meter wide, two-lane highway will pass through Lam Dong, home to Da Lat Town.

Of the cost, VND1 trillion will come from the government and the rest from the three provinces.

Prime Minister Pham Minh Chinh recently instructed the Ministry of Planning and Investment to quickly finalize the investment procedures for the construction for submission to the National Assembly for approval.

If the approval comes soon construction will start early next year and be completed in three years.

Once built, it will ease traffic on Provincial Road No.9, currently the only highway between Ninh Thuan and Lam Dong.

It will require 129 hectares of land, including 37 ha of farmland and seven hectares of residential lands. At least 211 families will have to be relocated.

Read More :
- Reduce Hair Loss with PURA D’OR Gold Label Shampoo
- Castor Oil Has Made a “Huge” Difference With Hair and Brow Growth
- Excessive hair loss in men: Signs of illness that cannot be subjective
- Dịch Vụ SEO Website ở Los Angeles, CA: đưa trang web doanh nghiệp bạn lên top Google
- Nails Salon Sierra Madre