Monday , November 11 2024

Transport ministry green-lights $136 mln to upgrade North-South railroad


The Ministry of Transport has approved upgrade of the North-South railroad at a cost of VND3.1 trillion ($136 million) as it seeks to improve the outdated network.

It will be divided into three projects.

The 319-kilometer section between Hanoi and Vinh will see the renovation of weak bridges and reinforcement of downgraded sections at a cost of VND854 billion.

Over VND1.19 trillion would be spent on similar upgrades to the 996-kilometer section between Vinh and Nha Trang and VND1.09 trillion on the 411-kilometer route from Nha Trang to HCMC.

The work is scheduled for completion by 2025 and will be overseen by the Railway Project Management Board.

The rail network has not received major upgrades in decades, and has lost out to road and air transport, preferred for their speed and convenience.

By 2050, the country plans to have 25 rail routes covering 6,354 km from the current seven and 2,440 km.

Read More :
- Reduce Hair Loss with PURA D’OR Gold Label Shampoo
- Castor Oil Has Made a “Huge” Difference With Hair and Brow Growth
- Excessive hair loss in men: Signs of illness that cannot be subjective
- Dịch Vụ SEO Website ở Los Angeles, CA: đưa trang web doanh nghiệp bạn lên top Google
- Nails Salon Sierra Madre