Friday , April 26 2024

Trà Vinh approves investment of 96MW wind power plant

 

A wind power project in Trà Vinh Province. The provincial authority has approved the investment plan and investor of the 96 W Thăng Long wind power plant in Lương Hòa A commune, Châu Thành district. — Photo baodautu.vn

TRÀ VINH — The Mekong Delta province of Trà Vinh has approved the investment plan and investor of the 96 MW Thăng Long wind power plant in Lương Hòa A Commune, Châu Thành District.

The project, which has total investment of VNĐ3.86 trillion (US$169 million) by Thăng Long Trà Vinh Wind Power JSC, is the ninth of its kind licensed in Trà Vinh. So far five plants have become operational with total capacity of 322 MW.

The project has 24 turbines, covering nearly 600 hectares, including 545 hectares of water surface.

It is scheduled to become operational in the third quarter of 2023.

Nguyễn Quỳnh Thiện, Deputy Chairman of the People’s Committee of Trà Vinh, said that the committee has proposed the Prime Minister approve the addition of wind, solar, biomass and gas power projects in the province with a total capacity of more than 46,500 MW to the National Power Development Planning for the 2021-30 period with a vision to 2045. — VnExpress News

Read More :
- Reduce Hair Loss with PURA D’OR Gold Label Shampoo
- Castor Oil Has Made a “Huge” Difference With Hair and Brow Growth
- Excessive hair loss in men: Signs of illness that cannot be subjective
- Dịch Vụ SEO Website ở Los Angeles, CA: đưa trang web doanh nghiệp bạn lên top Google
- Nails Salon Sierra Madre